Y-Tool
Y-Tool
The Y-Tool is designed to be run with ESP below PRH-4 packer. As the produced fluid leaves the ESP it flows through a pump sub and then joins the main production string through the Y-Tool profile that has been carefully designed to minimize flow erosion. The Y-Tool offsets the ESP in the well to provide a straight line conduit for wireline or coiled tubing tools to bypass the ESP. The Y-Tool has an upper connection for the production tubing and two lower connections, one for the ESP and the other for the bypass. A blanking plug is located in the bypass side in a special nipple to prevent recirculation of the pumped fluid. The blanking plug is removed prior to and after intervention. For logging operations, the blanking plug is replaced by a logging plug which allows real time or memory logging to be conducted whilst the pump is operating.
Features and Benefits
- Large flow area
- Minimize flow erosion
- Simple design
- Standard 2 3/8”, 2 7/8” and 3 1/2” sizes
- No. 33 , Gul Avenue , Singapore 629673
- enquiry@starpetrotech.com
- (65) 6863 1720
- (65) 6863 2360 (Fax)